House concrete slabs - for Castle Hill's estate releases and knockdown-rebuilds
New builds in Castle Hill need a licensed concreter who reads the engineer's drawings, knows the soil classification on the block and coordinates with the builder's programme. Getting the slab wrong at this stage means rectification costs that no one budgets for.
New builds across Castle Hill's growth corridor and knockdown-rebuild sites require raft slabs or waffle pod slabs poured to the structural engineer's specification. Soil classification varies across the Hills District - M class on most new estate blocks, but reactive clay profiles exist across the established areas - and we confirm site conditions before specifying. We work directly with your builder and certifier, coordinating with the construction programme so the slab is ready for frame on schedule.
KMA has poured residential slabs continuously across greater Sydney since 1999. Our house slab concreters work to Australian Standards AS2870 and AS3600 on every residential pour.


