New builds across Narellan's estate corridor need a slab poured to the right specification for the actual soil conditions on that block. Getting it wrong at the slab stage means structural problems that are expensive to rectify and nearly impossible to ignore.
New builds across Narellan Vale, Elderslie, Spring Farm, Catherine Field and Gregory Hills require raft slabs or waffle pod slabs poured to the structural engineer's specification. The reactive clay soil conditions common across the Camden LGA mean slab type and sub-base preparation must reflect actual site conditions - a generic specification applied across the board is how slabs fail. We work directly with your builder and certifier, coordinating with the construction programme so the slab is ready for frame on schedule.
KMA has poured residential slabs continuously across south-west Sydney since 1999. Our house slab concreters work to Australian Standards AS2870 and AS3600 on every residential pour.